12
AM

Recovery

Whether your body is ready for the load you have planned.

Today

Composite readiness score

76%Recovery

Ready to Train

Sleep
7h 42m
Muscle Fatigue
Low
Training Load
Moderate
Rest Recommendation
0 days

7-Day Recovery Trend

Higher is better

Sleep

7h 42m

last night

Resting HR

52bpm

−2 vs baseline

HRV

64ms

7-day mean

Training Load

Moderate

week 6 of block

Contributing Factors

What drives today's score

  • Sleep duration7h 42m average82
  • Sleep consistency±38 min bedtime74
  • Resting heart rate52 bpm88
  • HRV balance64 ms, 7-day mean69
  • Training loadModerate61

Lift IQ Insight

Cleared for heavy training today

At 76% recovery with low muscle fatigue, your planned push session at prescribed loads is appropriate. No rest day needed.

Lift IQ Insight

Bedtime variance is your weakest input

Sleep duration is strong but your bedtime moves by ±38 minutes. Tightening that window is the single fastest way to lift this score above 85%.

Rest Recommendation

0days

Next scheduled deload: week 8. Your 12-day streak is sustainable at current load.